How many kilowatts does your building need

A preliminary cooling-load estimate. An engineer will confirm the final configuration with a full heat-load calculation.

Room type
150 W per workstation
300 W per office MFP
Servers, kitchen, machinery. Office equipment goes above.
Refine: glazing

Preliminary capacity

7.5kW

Includes a 15% margin. Without it — 6.5 kW.

What it consists of

Walls, roof, lighting4
Sun through windows0
People1
Equipment1.5
What fitsLight-commercial systems or mini-VRF

An approximate estimate based on typical specific loads and the city's typical summer design temperature. Not a substitute for a design.